How much access is required to install the machine?
You’ll need to think about issues including:
You’ll need to think about issues including:
This will depend on the machine. Some run on a 3-phase supply and some
run on 240v via a 13-amp plug.
On a 6 meter machine which is our most common the longest rotation to the next carrier is 34 seconds.
Yes it can , you can actually have two picking openings one at ground and one at mezz level if required.
Yes it can and can also be linked to your current warehouse system.
A power source and a clear working area. Let the supplier know about any time required for a health and safety induction for your site.
A power source and a clear working area. Let the supplier know about any time required for a health and safety induction for your site.
Working with your supplier to decide on a cost effective and efficient system will include discussing what else you need to really make it work for you:
It will usually be 2-4 days per machine, depending on how straightforward the installation is.